Projects
Work where the temperature has to hold.
A selection of installations, retrofits and upgrades, each recorded with the problem it solved and the evidence it produced.
CommercialYour City · 2025
Regional office VRF retrofit
A four-storey office with an ageing split system suffered uneven comfort across floors and rising running costs. The fabric could not take a full chilled-water conversion within the lease terms.
- Peak cooling capacity
- [TBC] kW
- Energy vs. baseline
- [TBC] %
Data centreYour City · 2025
Tier III server hall cooling
A growing colocation hall had rack densities above its original design basis, with hot spots at the end of aisles and no redundancy on the precision cooling.
- Redundancy
- N+1
- Inlet temperature spread
- [TBC] °C
IndustrialYour City · 2024
Plant room chiller upgrade
A manufacturing site ran two constant-speed chillers and a fixed-speed pump set, causing excess energy use and frequent short-cycling during part-load operation.
- Chilled-water plant energy
- [TBC] %
- Compressor starts per day
- [TBC] reduction
Have a similar building or room?
Send us the basics and we'll tell you whether we've solved the same kind of problem before.