Commercial · Your City · 2025

Regional office VRF retrofit

A four-storey office with an ageing split system suffered uneven comfort across floors and rising running costs. The fabric could not take a full chilled-water conversion within the lease terms.

Illustrative case study: figures in brackets are pending client sign-off.

Approach

What we did.

  1. 01Measured heat gains per zone over two weeks before any design work
  2. 02Selected VRF with zoned branch control matched to occupancy patterns
  3. 03Phased installation floor by floor to keep the building occupied
  4. 04Handed over with a 24-month planned maintenance schedule

Outcomes

Peak cooling capacity
[TBC] kW
Energy vs. baseline
[TBC] %
Install programme
[TBC] weeks, occupied

Planning something comparable?

Tell us about the building and the constraints. We'll say early whether this kind of approach fits.